WORKS STARTING FOR ELECTRON ACCELERATOR CONTROL ROOM AT ZHEJIANG UNIVERSITY

WORKS STARTING FOR ELECTRON ACCELERATOR CONTROL ROOM AT ZHEJIANG UNIVERSITY

29.07.2019 |

Construction works for the electron accelerator control room of Zhejiang University’s Institute of Nuclear-Agricultural Science in Zijingang Campus have just started.

The project is scheduled to be built during the summer vacation, so the electron accelerator can be presented from 2019/2020 winter semester onwards. This project is 2408’s second design project at Zhejiang University.